Current Projects

Back to work blues

I haven’t had much time for knitting this week.  I had to go back to work, so I’m getting back on schedule.  Not enough sleep = SleepyScotsman = knitting mistakes = NotKnittingScotsman.

 I did notice a huge mistake on my Celtic Cable Cap about 10 rows down, so I frogged it.  I caught back up last night.  I’m too tired this evening to work on a complicated pattern, and I haven’t found a sock pattern for the aran weight yarn I’ve got earmarked for some wearing around the cold house socks.

I still need to order the yarn for my FLAK sweater.  I did chart out an entire single repeat in Excel.  It’s 121 stitches wide, with a 24 row repeat.  I figure I’ll take it easy on my first big sweater project.  Now I just need to get some legal size paper so I can read it when it is printed.  Next step is to swatch a single repeat of my cables, then I can size the sweater, and I’ll be ready to start knitting. (after I get the yarn of course).

You might notice the nifty progress bars off to the left.  Thanks Ravelry, for providing an project API.  If you are a member of Ravelry, and want to incorporate progress bars on your site, take a look HERE.  If you host your own WordPress, look HERE for a plug in that will make adding the progress bars easier.

Leave a Reply